Before quote
Send STEP/STP, 2D drawings, material, finish, quantity, tolerance notes, deadline, destination country, and NDA needs. Complete RFQs are reviewed within 24 hours.
Quality & evidence
Use this page to decide what evidence to request before production: DFM notes, process photos, CMM or FAI checks, material certificates, finish samples, packing photos, and export handoff details.
Send STEP/STP, 2D drawings, material, finish, quantity, tolerance notes, deadline, destination country, and NDA needs. Complete RFQs are reviewed within 24 hours.
Ask for DFM feedback, process route, critical dimension plan, surface finish feasibility, material availability, and confirmation of what will be inspected.
Request first article photos, CMM or FAI checks when applicable, material certs when available, finish photos, packing photos, and carrier handoff details.
Use these redacted templates to decide which documents belong in your RFQ. They are sample-only formats, not default deliverables.
Sample only. These files are not certificates or default shipment reports. COC, material certificate, dimensional report, CMM, FAI, finish approval sheet, packing checklist, and export handoff evidence must be agreed during RFQ.
Inspection documents
Quality evidence depends on the part, tolerance, material, and inspection scope. We keep the promise precise: these documents are available when agreed during RFQ, not implied for every order by default.
Useful for first article approval, drawing revision confirmation, and low-volume production launch.
Best for critical dimensions, GD&T callouts, datum-sensitive features, and fit-critical assemblies.
Available when material traceability matters and the requested grade can be sourced with paperwork.
Photos of cosmetic surfaces, color samples, masking, protective packing, labels, and export carton condition.
範囲とスケジュール
CMM、FAI、材料トレーサビリティ、仕上げ承認、梱包証跡は、検査時間、報告書作成、スケジュールに影響するため製造前に選定します。
サンプル書類パッケージを依頼GD&T指定、データム依存形状、嵌合に重要な穴、簡易ゲージでは信頼確認しにくい寸法がある場合。
初期外観モデル、緩い嵌合の筐体、写真と主要手動確認で判断できるコンセプトサンプルの場合。
初品で図面改訂、小ロット開始、サプライヤー確認、追加部品前の検査計画を管理する場合。
承認または出荷前に合金、樹脂グレード、熱処理、ロット、適合書類を確認する必要がある場合。
No. CMM and FAI reports should be agreed during RFQ because they affect inspection time, cost, and schedule.
Yes. For suitable projects, DFocus can share production photos, finish photos, key measurement evidence, and packing photos before shipment.
Send CAD files, 2D drawings for critical tolerances, material, quantity, finish, inspection needs, shipping country, target deadline, and NDA requirements.
Certification boundary
DFocus does not treat every project as certification-backed by default. Inspection reports, material certificates, COC, FAI/CMM records, finish samples, packing photos, and export handoff evidence must be agreed during RFQ and quoted with the required scope.
Your quote can define the evidence package needed before shipment, including dimensional checks, material traceability, process photos, and packing proof.
A public page statement is not a certificate, regulated-device approval, or blanket system-certification guarantee. Certified entity, certificate number, scope, and expiry must be shown before a certification claim is used.
Tell engineering whether you need CMM, FAI, material certs, COC, finish photos, packing photos, automotive submission inputs, NDA, or export documentation.
DFocus PROTOTYPEチームです。
CNC加工、3Dプリント、表面処理の相談が必要ですか。プロジェクト情報を送れば、適切な見積りルートを案内します。